Dublin

NRH Redevelopment

NRH Redevelopment
Client
National Rehabilitation Hospital
Scale
17,000 sq m
Tags

Embedding a highly efficient modular wiring system in a major hospital development.

The Story

The National Rehabilitation Hospital (NRH) provides complex specialist rehabilitation services to patients who, as a result of an accident, illness, or injury, have acquired a physical or cognitive disability and require a specialist program of rehabilitation.

We worked with consulting engineer, Ethos Engineering, and electrical contractor, Jones Engineering, to fit a modern electrical installation to the building.

The Solution

Our prefabricated modular wiring system, made from Wieland pluggable components, ensures an easy plug-and-play installation, saving time and reducing errors, costs, risks and waste on site.

The Success

The wiring system offers a high degree of reliability and flexibility that enables the smooth distribution of power throughout the building. Overall, the system helps ensure continuity within the hospital and contributes to the safety of patients, visitors, and staff.

Featured Systems

Modular Wiring
Plug and Play to the Final Point

Manufactured and tested off-site for a fast installation on-site, our modular wiring solutions reduce costs and improve efficiency during your project and across the life of the building.

Have a project? Get in touch


    Subscribe to our newsletter

    By submitting you agree with the Terms and Conditions and Privacy Policy

    Cashel Palace


    View Project

    Stryker


    View Project