Dublin

CLN Data Centre

CLN Data Centre
Client
Un-disclosed
Scale
1.6 M sq. ft
Tags

A high-performance cable containment solution acts as a project accelerator in a European data centre.

 

The Story

Our client’s rapid global expansion led to the construction of its second European data centre. It will be powered entirely by renewable energy, making it one of the most advanced, efficient and sustainable data centres in the world. It will significantly boost economic activity and support hundreds of jobs in the local community.

The data centre is a 31,000 sq. m, performance-orientated building packed with cutting-edge technology. The client wanted a high-performance cable management solution that could be installed quickly and easily.

The Solution

We were selected to supply our easy-to-install steel containment and bracketry systems from OBO Bettermann, including special quick-kit side loading bracketry options. These systems are ideal for the straight-run structure of data centres, and they reduce installation time and labour costs.

The Success

The system we installed met all the client’s requirements and acted as a project accelerator. It was a cost-effective and high-performance solution that supports the intense activity of the data centre.

 

 

 

Featured Systems

Steel Cable Containment
Route, Support, Protect

Ensure your cabling is safe, accessible and protected with our steel containment solutions. Fast and simple to install, and totally dependable over the life of your building, our tailored containment solutions will keep your building connected, no matter how harsh your environment.

Have a project? Get in touch


    Subscribe to our newsletter

    By submitting you agree with the Terms and Conditions and Privacy Policy

    Cashel Palace


    View Project

    Stryker


    View Project